Qualification test

Prior to production of a new connector type or connector range


Pressure test:
5 x cycle test 0 to 800 bar, holding time 10 minute per cycle
1 x 0 to 800 bar holding time 1 hour


Electrical test during pressure test:
Continuity test: Pin to pin
Insulation test between all contacts and body/tank: At 500 V DC. Minimum 200 Mohm


Electrical test after pressure test:
Continuity test: Pin to pin
Insulation test between all contacts and body: At 500 V DC. Minimum 200 Mohm    

High pot test : At 2 x Voltage rating plus 1 KV

CONTACT US FOR MORE INFO

Call us

(858) 454-4044

Address

7416 Cabrillo Avenue, La Jolla, CA  92037, United States